06 — Assembly & validation

Assembled, tested and signed off. Before it ships.

Mechanics, electronics and software come together in one place. We integrate, wire, assemble and test complete systems against documented acceptance criteria — and turn a working prototype into a repeatable production process.

Every Ozmec system is integrated and validated on this line.

ESD-protected assembly · 100% functional test · QMS aligned with EN 9100 (in progress)

Integration bench lined with quadcopters and airframes awaiting test
Units functionally tested
100%
Dedicated test rigs & fixtures
15+
Quality gates per build
6
Ozmec platforms integrated here
4
Assembly & integration / 01

Where the disciplines become one system.

Mechanical fit, harness routing and electronic interfaces are checked together — by the engineers who designed them. Integration problems surface on our bench, not in your field trial.

Crimping tool and colour-coded wires for a cable harness

Wiring & harnesses

  • Harnesses built to IPC/WHMA-A-620 Class X
  • Crimp pull-testing and continuity testing on every harness
  • Labelled, documented, routed for vibration
Stack of assembled electronics units with braided harnesses

System assembly

  • ESD-protected area to EN 61340-5-1
  • Torque-controlled fastening, documented per step
  • Work instructions with photos for every build
Validation / 02

Proof that it works. On paper and in the field.

From the first power-up to field trials, every test runs against written acceptance criteria and ends in a signed report.

In-house

Functional testing

Power-up, interfaces, sensors and actuators exercised on dedicated fixtures.

In-house

Burn-in

X-hour powered run to catch early-life failures before delivery.

IN-HOUSE / PARTNER LAB

Environmental

Vibration, thermal cycling, IP ingress — to MIL-STD-810 / DO-160 methods.

IN-HOUSE / PARTNER LAB

EMC pre-compliance

Emission and immunity scans before formal certification testing.

In-house

Field testing

Validated in real conditions — in the air, on track or on site — with full logging and analysis.

With you

Factory acceptance (FAT)

Acceptance test procedure run with your team — on site or remotely witnessed.

Quality / 03

Six quality gates. Built into every build.

Quality is not a final inspection. It runs from incoming parts to release — the same discipline we are preparing to certify under EN 9100.

  1. Gate 01

    Incoming inspection

    Parts, PCBs and harnesses verified against drawing and spec.

  2. Gate 02

    In-process control

    Checkpoints during integration catch deviations early.

  3. Gate 03

    Functional test

    Powered and exercised on fixtures before leaving the bench.

  4. Gate 04

    Final acceptance

    Checked against acceptance criteria, released with a signed result.

  5. Gate 05

    Traceability

    Serials, batches and records trace every build to its parts.

  6. Gate 06

    Calibrated equipment

    Calibrated instruments keep results comparable over time.

Production readiness / 04

From one working unit to a repeatable process.

A demo that works once is not a product. We build the fixtures, procedures and test software that make every unit identical — and hand them over if you produce elsewhere.

Test rigs
Custom fixtures and test benches designed and built in-house
Test software
Automated test sequences with pass / fail logging per serial number
Work instructions
Step-by-step assembly and test procedures, versioned with the design
Non-conformance
Deviations recorded, root-caused and closed with corrective actions
Transfer
Full process package for production at your site or a partner of your choice
Process / 05

From parts on the bench to accepted system in five steps.

Bring us a design we built, a design you built, or a kit of parts. Every step ends with a documented result.

  1. 01

    Build plan

    Assembly sequence, test plan and acceptance criteria agreed with you.

  2. 02

    Pilot build

    First units assembled, work instructions written from the real build.

  3. 03

    Validation campaign

    Functional, environmental and field tests against the plan.

  4. 04

    Acceptance

    FAT with your team, signed acceptance report.

  5. 05

    Series or transfer

    Small-series production with us, or full process handover.

Deliverables / 06

What you receive.

Systems you can deploy — and the evidence your quality and procurement teams need to accept them.

Assembled systems
Integrated, tested and serialised units ready to deploy
Test procedures & reports
ATP, test results per serial number, environmental test reports
Acceptance documentation
Signed FAT report and certificate of conformity
Traceability records
As-built configuration: parts, batches, firmware versions per unit
Work instructions
Versioned assembly and test procedures
Production-ready process
Test rigs, test software and documentation for series production
FAQ / 07

Before you ask.

Can you assemble systems we designed?

Yes. We integrate and test customer designs, including customer-supplied parts, after a short build-readiness review.

Which tests do you run in-house?

Functional, burn-in and field tests in-house; environmental and EMC testing with accredited partner labs. We plan and manage the whole campaign.

Can our team witness acceptance tests?

Yes. Factory acceptance tests can be witnessed on site in Ormož or remotely.

Can you transfer production to our facility?

Yes. We hand over work instructions, test rigs and test software, and support the first builds at your site.

Are you EN 9100 certified?

Not yet. Our quality system is aligned with EN 9100 and certification is in progress, target quarter / year.

Start a project

Bring us your system. We'll prove it works.

Share your design, quantities and acceptance requirements. Our quality lead replies within 2 working days with a build and test proposal — under NDA if you need it.

Send requirements→